Operations & Supply Chain · Quality Management

Forum for Innovation — Choose Esmaltec's Quality Fix Under a Delivery Constraint

A four-round, advanced operations-and-innovation simulation set inside Esmaltec Sul S.A., a Joinville (Santa Catarina) maker of enameled steel and ceramic-coated home and building products — R$720 million revenue, 12.5% EBITDA, one plant with four lines running near a hard 2.1M-units/year ceiling.

4 rounds Executive English, Español

Preview

About this simulation

A four-round, advanced operations-and-innovation simulation set inside Esmaltec Sul S.A., a Joinville (Santa Catarina) maker of enameled steel and ceramic-coated home and building products — R$720 million revenue, 12.5% EBITDA, one plant with four lines running near a hard 2.1M-units/year ceiling.

The defect rate has crept to 4.2% (best-in-class ~1.5%), cost of quality runs at 9% of revenue (R$64.8M/year — more than two-thirds of EBITDA), and on 18 March 2026 the firm's largest customer CasaForte (24% of revenue, R$173M) issues an ultimatum: cut the defect rate on its lines below 2.0% within two quarters or it dual-sources 50% of the volume (R$86.5M at risk, a further R$120M if the reputation spreads).

As the VP Operations, advised by Esmaltec's university-industry Innovation Forum, you (1) diagnose the defect Pareto and cost-of-quality structure to tell a process-limitation root cause from an execution-variation one; (2) choose the innovation project inside a R$22M envelope among process innovation A (electrostatic enamel + in-line vision, R$19M, gets defects to ~1.6% but a 6-month install removes ~180,000 units of peak-season capacity), product innovation B (a premium nano-coating extension, R$14M, revenue upside but raises near-term defect risk on the watched lines), and continuous-improvement C (Six Sigma DMAIC + SPC, R$4.5M, fast and low-downtime but plateaus around 2.8%) — or a feasible combination; (3) set a balanced quality scorecard rather than a single defect-rate target that invites gaming cycle time and cost of quality; and (4) sequence the rollout to protect CasaForte's peak volume while a mid-project trial underperforms — phasing installs, overtime, temporary outsourcing or renegotiating the deadline.

The math rewards reframing quality spend as an investment against the R$64.8M cost-of-quality bleed, matching the intervention to the Pareto root cause, focusing the budget instead of spreading it thin, a balanced scorecard, and phasing the install around the capacity ceiling — and punishes the five classic errors: revenue before stability, ignoring downtime, thin spreading, single-metric tunnel vision, and treating the project as pure expense.

Final KPIs track Defect Rate %, Cost of Quality % of revenue, CasaForte Delivery, and Innovation Pipeline value.

Who it is for

An advanced simulation for participants used to working with the main frameworks and trade-offs of the subject, designed for executive education and experienced professionals.

How a session runs

  1. The instructor creates a session from the Eureka dashboard and invites the participants.
  2. Participants play 4 rounds. In each one they submit their decisions and the simulation calculates the results.
  3. The simulation can be run in English, Español.
  4. The instructor follows each participant's progress and results from the dashboard, and uses the class results for the debrief.

Decisions participants make

The decisions participants make during the simulation:

  • What does the defect Pareto tell you about the dominant root cause?
  • How do you frame the cost of quality to the board?
  • How rigorously does your team build the Pareto + cost-of-quality diagnosis? (%)
  • Which innovation project (or combination) do you fund inside the R$22 mi envelope?
  • How much of the R$22 mi do you actually commit this year? (R$ millions)
  • How firmly do you reframe the spend as protecting margin against the R$64,8 mi bleed? (%)
  • What quality scorecard do you commit to manage to?
  • Allocate engineering & floor-time effort across the lines (must total 100%)
  • How heavily do you lean on 100% manual re-inspection to force the number down? (%)
  • The 6-month install threatens peak-season output. How do you sequence it?

What participants track

What participants follow on screen as the rounds go by:

  • Defect Rate, Cost of Quality & Delivery Trajectory

Subjects covered

Designed for courses in Quality Management.

Ready to use Forum for Innovation — Choose Esmaltec's Quality Fix Under a Delivery Constraint with your students?

Contact us and we'll set you up with a free trial session.

Contact us