Operaciones y cadena de suministro · Gestión de la calidad

Forum for Innovation — Choose Esmaltec's Quality Fix Under a Delivery Constraint

A four-round, advanced operations-and-innovation simulation set inside Esmaltec Sul S.A., a Joinville (Santa Catarina) maker of enameled steel and ceramic-coated home and building products — R$720 million revenue, 12.5% EBITDA, one plant with four lines running near a hard 2.1M-units/year ceiling.

4 rondas Ejecutivo English, Español

Vista previa

Sobre la simulación

A four-round, advanced operations-and-innovation simulation set inside Esmaltec Sul S.A., a Joinville (Santa Catarina) maker of enameled steel and ceramic-coated home and building products — R$720 million revenue, 12.5% EBITDA, one plant with four lines running near a hard 2.1M-units/year ceiling.

The defect rate has crept to 4.2% (best-in-class ~1.5%), cost of quality runs at 9% of revenue (R$64.8M/year — more than two-thirds of EBITDA), and on 18 March 2026 the firm's largest customer CasaForte (24% of revenue, R$173M) issues an ultimatum: cut the defect rate on its lines below 2.0% within two quarters or it dual-sources 50% of the volume (R$86.5M at risk, a further R$120M if the reputation spreads).

As the VP Operations, advised by Esmaltec's university-industry Innovation Forum, you (1) diagnose the defect Pareto and cost-of-quality structure to tell a process-limitation root cause from an execution-variation one; (2) choose the innovation project inside a R$22M envelope among process innovation A (electrostatic enamel + in-line vision, R$19M, gets defects to ~1.6% but a 6-month install removes ~180,000 units of peak-season capacity), product innovation B (a premium nano-coating extension, R$14M, revenue upside but raises near-term defect risk on the watched lines), and continuous-improvement C (Six Sigma DMAIC + SPC, R$4.5M, fast and low-downtime but plateaus around 2.8%) — or a feasible combination; (3) set a balanced quality scorecard rather than a single defect-rate target that invites gaming cycle time and cost of quality; and (4) sequence the rollout to protect CasaForte's peak volume while a mid-project trial underperforms — phasing installs, overtime, temporary outsourcing or renegotiating the deadline.

The math rewards reframing quality spend as an investment against the R$64.8M cost-of-quality bleed, matching the intervention to the Pareto root cause, focusing the budget instead of spreading it thin, a balanced scorecard, and phasing the install around the capacity ceiling — and punishes the five classic errors: revenue before stability, ignoring downtime, thin spreading, single-metric tunnel vision, and treating the project as pure expense.

Final KPIs track Defect Rate %, Cost of Quality % of revenue, CasaForte Delivery, and Innovation Pipeline value.

Para quién es

Una simulación avanzada para participantes acostumbrados a trabajar con los principales marcos y dilemas de la materia, pensada para formación de directivos y profesionales con experiencia.

Cómo funciona una sesión

  1. El docente crea una sesión desde el panel de Eureka e invita a los participantes.
  2. Los participantes juegan 4 rondas. En cada una envían sus decisiones y la simulación calcula los resultados.
  3. La simulación se puede jugar en: English, Español.
  4. El docente sigue el progreso y los resultados de cada participante desde el panel, y usa los resultados de la clase para el debriefing.

Decisiones que toman los participantes

Las decisiones que toman los participantes durante la simulación:

  • What does the defect Pareto tell you about the dominant root cause?
  • How do you frame the cost of quality to the board?
  • How rigorously does your team build the Pareto + cost-of-quality diagnosis? (%)
  • Which innovation project (or combination) do you fund inside the R$22 mi envelope?
  • How much of the R$22 mi do you actually commit this year? (R$ millions)
  • How firmly do you reframe the spend as protecting margin against the R$64,8 mi bleed? (%)
  • What quality scorecard do you commit to manage to?
  • Allocate engineering & floor-time effort across the lines (must total 100%)
  • How heavily do you lean on 100% manual re-inspection to force the number down? (%)
  • The 6-month install threatens peak-season output. How do you sequence it?

Qué siguen los participantes

Lo que los participantes siguen en pantalla a medida que avanzan las rondas:

  • Defect Rate, Cost of Quality & Delivery Trajectory

Temas que cubre

Diseñada para asignaturas de Gestión de la calidad.

¿Quieres usar Forum for Innovation — Choose Esmaltec's Quality Fix Under a Delivery Constraint con tus estudiantes?

Escríbenos y te preparamos una sesión de prueba gratuita.

Contactar