Business

Fábrica de muebles

A 90-minute, 4-round basic Express simulation for Spanish vocational training (Formacion Profesional), module 0990 Gestion de la produccion en carpinteria y mueble of the Tecnico Superior en Diseno y Amueblamiento (Real Decreto 1579/2011).

4 rounds Undergraduate English, Español

Preview

About this simulation

A 90-minute, 4-round basic Express simulation for Spanish vocational training (Formacion Profesional), module 0990 Gestion de la produccion en carpinteria y mueble of the Tecnico Superior en Diseno y Amueblamiento (Real Decreto 1579/2011).

The learner is Irene Lorente, a newly qualified furniture technician who plans the capacity of a fictional kitchen and hotel-furniture factory in Yecla (Murcia) through 2027: one CNC nesting machine and an edge-bander, two peaks a year above the plant's capacity, and the lacquering and part of the assembly sent to outside workshops when the plant overflows.

Four situations set the year's course: an order book with two peaks, and how the board and the fittings are bought (on the needs of the master plan) and how the year's capacity is planned (a capacity plan by quarter with a second shift for the peaks); the spring peak, and what the plant makes and what it buys out (the core in the plant, only the lacquering bought out on a written specification) and how the CNC is maintained (a preventive maintenance plan); the autumn peak, and how the overflow is subcontracted (written orders to approved workshops, followed every week) and how the shifts cover it (a second shift with the twelve hours of rest kept); and a hotel order, and how it is accepted (deliveries split on the CNC's load after checking the margin) and how the year is accounted (a cost account by order with the make-or-buy list).

Two critical errors cap the round: a bridged door interlock on the CNC, and shifts chained without the twelve hours of rest. KPIs: sales with margin, controllable cost, pieces delivered late or incomplete per 1,000 and thousand euros of stock without an order or of rejected parts. Lesson: subcontracting relieves the peaks but gives away margin and control. Spanish primary, English parity.

Fictional company, brand and people; real curriculum and rules cited.

Who it is for

An introductory simulation that assumes no prior knowledge of the subject, designed for undergraduate courses. It also works in vocational and high-school programmes and in onboarding sessions.

How a session runs

  1. The instructor creates a session from the Eureka dashboard and invites the participants.
  2. Participants play 4 rounds. In each one they submit their decisions and the simulation calculates the results. The first round opens with: lunes 18 de enero, 9:00: el tablero y la capacidad.
  3. The simulation can be run in English, Español.
  4. The instructor follows each participant's progress and results from the dashboard, and uses the class results for the debrief.

Decisions participants make

The decisions participants make during the simulation:

  • Cómo se compran el tablero y los herrajes
  • Cómo se planifica la capacidad del año
  • Qué hace la planta y qué compra fuera
  • Cómo se mantiene la CNC
  • Cómo se subcontrata el exceso del verano
  • Cómo cubren los turnos el pico de otoño
  • Cómo se acepta el pedido del hotel
  • Cómo se hace la cuenta del año

Ready to use Fábrica de muebles with your students?

Contact us and we'll set you up with a free trial session.

Contact us