Operations & Supply Chain · Supply Chain Management

Agile or Lean? — VOEC's Resilience Configuration

A four-round, advanced supply-chain resilience simulation set inside Volunteer Outdoor Equipment Co. (VOEC), a USD 540M mid-market outdoor-gear manufacturer in Knoxville, Tennessee, on a 38% gross / 9% operating margin.

4 rounds Executive English, Español

Preview

About this simulation

A four-round, advanced supply-chain resilience simulation set inside Volunteer Outdoor Equipment Co. (VOEC), a USD 540M mid-market outdoor-gear manufacturer in Knoxville, Tennessee, on a 38% gross / 9% operating margin.

It is April 2026 and two shocks collide in one quarter: a transpacific port disruption stretches Vietnam lead times from 75 to ~115 days with wild arrival variance, while an influencer surge makes one performance tent line go viral (sell-through triples in three weeks).

VOEC is simultaneously SHORT the full-margin hot SKU (fill rate 61% on the viral line, 82% overall vs a 95% target, ~USD 14M of full-margin demand unserved) and LONG USD 22M of slow basics facing 20–30% markdowns — the textbook mismatch between supply-chain design and demand type.

Inventory has climbed to USD 96M against a USD 110M revolving facility already drawn to USD 98M at SOFR + 3.0%; another month at this draw triggers a covenant conversation.

Playing the Logistics & Supply-Chain Director, you run the company through four rounds: (1) DIAGNOSE the portfolio — classify SKUs as functional/predictable (lean candidates) vs innovative/volatile (agile candidates) and place VOEC on Goldsby's three resilience dimensions (preparedness, alertness, agility); (2) PLAN the buffer and sourcing architecture per product family — keep cheap lean ocean sourcing for basics, add a near-shore agile source for performance SKUs, or run a dual-sourcing leagile split with a decoupling point, every choice consuming working capital; (3) DECIDE the live shock response — how much of the viral SKU to expedite by air (USD 4.20/unit vs USD 0.45 ocean), how to allocate scarce supply across channels, what to mark down now vs hold, and how much to invest in ALERTNESS (control-tower visibility, supplier early-warning, demand-sensing); and (4) RECOVER by committing a coherent resilience configuration to the board and the bank, proving the design lifts fill rate and the agility index WITHOUT breaching the working-capital line, and that it is robust to the NEXT shock, not just this one.

The math rewards selective buffering matched to demand variability, a lean/agile decoupling point, a SKU-level margin test on expediting, alertness paired with agility, and durable standing capability — and punishes the five classic errors: blanket safety stock that breaches the line, one-size-fits-all lean or agile, indiscriminate air freight, agility without alertness, and a single-shock patch.

Final KPIs track Fill Rate (%), Working-Capital headroom (USD M to the line), Agility Index (0–100), and Total Logistics Cost impact (USD M vs status quo).

Who it is for

An advanced simulation for participants used to working with the main frameworks and trade-offs of the subject, designed for executive education and experienced professionals.

How a session runs

  1. The instructor creates a session from the Eureka dashboard and invites the participants.
  2. Participants play 4 rounds. In each one they submit their decisions and the simulation calculates the results.
  3. The simulation can be run in English, Español.
  4. The instructor follows each participant's progress and results from the dashboard, and uses the class results for the debrief.

Decisions participants make

The decisions participants make during the simulation:

  • How do you classify the portfolio for supply-chain design?
  • Where does VOEC sit worst today on Goldsby's three resilience dimensions?
  • How sharply do you commit to the demand-supply fit map as the spine of the plan? (%)
  • Choose the sourcing architecture across the portfolio.
  • Safety-stock build this quarter — extra inventory added across SKUs (US$M)
  • Where do you position the buffer you do build?
  • Expedite the viral SKU by air? Share of the replenishment flown vs shipped ocean (%)
  • What governs which units you fly?
  • The US$22M of slow basics at markdown risk — what now?
  • Invest in ALERTNESS capability — control-tower visibility, supplier early-warning, demand-sensing (US$M)

What participants track

What participants follow on screen as the rounds go by:

  • Fill Rate, Agility & WC Headroom Trajectory

Subjects covered

Designed for courses in Supply Chain Management.

Ready to use Agile or Lean? — VOEC's Resilience Configuration with your students?

Contact us and we'll set you up with a free trial session.

Contact us