Megaproject Management — The Infrastructure Mega-Build
Recover a 4G road concession in crisis: diagnose the overrun with reference-class forecasting, restructure cost/schedule/scope levers, negotiate…
A bilingual UNAD ECACEN simulation. Players run a 1.4 km streetscape contract in Bucaramanga where 28 of 142 trees are flagged by the CDMB, three NTC 4595 / 6047 accessibility defects are blocking pours, and a 5% contingency must absorb a 7.8% overrun — all in front of a citizens watchdog.
A bilingual UNAD ECACEN simulation. Players run a 1.4 km streetscape contract in Bucaramanga where 28 of 142 trees are flagged by the CDMB, three NTC 4595 / 6047 accessibility defects are blocking pours, and a 5% contingency must absorb a 7.8% overrun — all in front of a citizens watchdog.
Across four rounds teams diagnose the design, redesign the andén, negotiate in parallel with the city, the CDMB and the interventoría, and present a public commitment to the Veeduría Ciudadana.
An intermediate simulation for participants who already know the core concepts of the subject, designed for master's and MBA programmes.
The decisions participants make during the simulation:
What participants follow on screen as the rounds go by:
Designed for courses in Project Management.
Contact us and we'll set you up with a free trial session.
Contact us