Megaproject Management — The Infrastructure Mega-Build
Recover a 4G road concession in crisis: diagnose the overrun with reference-class forecasting, restructure cost/schedule/scope levers, negotiate…
A bilingual UNAD ECACEN simulation. Players run a 1.4 km streetscape contract in Bucaramanga where 28 of 142 trees are flagged by the CDMB, three NTC 4595 / 6047 accessibility defects are blocking pours, and a 5% contingency must absorb a 7.8% overrun — all in front of a citizens watchdog.
A bilingual UNAD ECACEN simulation. Players run a 1.4 km streetscape contract in Bucaramanga where 28 of 142 trees are flagged by the CDMB, three NTC 4595 / 6047 accessibility defects are blocking pours, and a 5% contingency must absorb a 7.8% overrun — all in front of a citizens watchdog.
Across four rounds teams diagnose the design, redesign the andén, negotiate in parallel with the city, the CDMB and the interventoría, and present a public commitment to the Veeduría Ciudadana.
Una simulación de nivel intermedio para participantes que ya conocen los conceptos básicos de la materia, pensada para programas de máster y MBA.
Las decisiones que toman los participantes durante la simulación:
Lo que los participantes siguen en pantalla a medida que avanzan las rondas:
Diseñada para asignaturas de Gestión de proyectos.