Business

Estrategia de mantenimiento de planta

A 90-minute, 4-round basic Express simulation for Spanish vocational training (Formacion Profesional, grado superior), module 0942 Procesos y gestion de mantenimiento y calidad of the Tecnico Superior en Mecatronica Industrial (Real Decreto 1576/2011).

4 rounds Undergraduate English, Español

Preview

About this simulation

A 90-minute, 4-round basic Express simulation for Spanish vocational training (Formacion Profesional, grado superior), module 0942 Procesos y gestion de mantenimiento y calidad of the Tecnico Superior en Mecatronica Industrial (Real Decreto 1576/2011).

The learner is Leire Iraizoz, the new maintenance technician of a fictional stamping and robotic-welding plant in Navarra that supplies a car assembly plant just in time, through 2029, quarter by quarter: the maintenance strategy, the technicians per shift, the spares, a vibration alarm on a transfer press, the August shutdown before a model launch, the repairs, the indicators and the jams of the welding cell.

Six critical machines stop the line and some sixty auxiliary ones rarely do: predictive maintenance pays on the critical machines, and on the rest corrective can be enough. Scored on OEE, availability, total maintenance cost, direct cost against budget and non-conformities.

One hard-fail caps the round at 40: bridging the light curtain to clear jams with the cell running (Real Decreto 1215/1997, Annex I 1.8 and Annex II 1.14). Spanish primary, English parity.

Who it is for

An introductory simulation that assumes no prior knowledge of the subject, designed for undergraduate courses. It also works in vocational and high-school programmes and in onboarding sessions.

How a session runs

  1. The instructor creates a session from the Eureka dashboard and invites the participants.
  2. Participants play 4 rounds. In each one they submit their decisions and the simulation calculates the results. The first round opens with: Lunes 8 de enero de 2029: la estrategia y los técnicos.
  3. The simulation can be run in English, Español.
  4. The instructor follows each participant's progress and results from the dashboard, and uses the class results for the debrief.

Decisions participants make

The decisions participants make during the simulation:

  • La estrategia de mantenimiento
  • Los técnicos
  • Los repuestos
  • La alarma de la prensa 2
  • La parada de agosto
  • Las averías
  • Los indicadores
  • Los atascos de la célula

Ready to use Estrategia de mantenimiento de planta with your students?

Contact us and we'll set you up with a free trial session.

Contact us