Operations & Supply Chain · Operations Management

Eficiencia en Terminal de Contenedores: Barranquilla

Simulación de gestión portuaria para Terminal Costera Barranquilla (TCB). Los participantes deciden inversiones en mantenimiento de grúas, software operativo, nuevas RTGs, grúas STS y cumplimiento laboral durante 4 años (2026-2029) para competir con Cartagena, optimizar movimientos por hora y proteger el margen EBITDA.

4 rounds Executive English, Español

Preview

What participants learn

After the session, participants will be able to:

  • Prioritize a fixed capital budget across terminal operating levers by marginal value per peso and by timing, rather than by the size or visibility of the investment
  • Diagnose threshold effects in a competitive operating metric and explain why a small gain in moves per hour can change tariffs and the volume lost to a rival port
  • Evaluate labour compliance and labour policy as operating levers, distinguishing the nominal cost of a labour measure from its full economic cost and payoff
  • Design and defend before a board a sequenced four-year investment plan that states explicitly the trade-off between margin and volume it accepts

Prerequisites

  • Comfort with EBITDA and operating margin

Who it is for

An advanced simulation for participants used to working with the main frameworks and trade-offs of the subject, designed for executive education and experienced professionals.

How a session runs

  1. The instructor creates a session from the Eureka dashboard and invites the participants.
  2. Participants play 4 rounds. In each one they submit their decisions and the simulation calculates the results.
  3. The simulation can be run in English, Español.
  4. The instructor follows each participant's progress and results from the dashboard, and uses the class results for the debrief.

Decisions participants make

The decisions participants make during the simulation:

  • A · Mantenimiento Preventivo Agresivo COP 2,800M · reduce downtime de 5% a 2.5%
  • C · Software ICTSI + IoT COP 90M · reduce tiempo espera 2.5 h
  • D · 3 RTGs Adicionales COP 270M · alivio congestión patio
  • E · Paquete Laboral (Decreto 1477) COP 200M · rotación, pausas y equipo ergonómico
  • B · Nuevas Grúas STS (0 a 2 por año)
  • Política Laboral

What participants track

What participants follow on screen as the rounds go by:

  • Decisiones de Inversión (CAPEX)
  • Resultado Final del Plan de Transformación
  • Historial Operativo

Subjects covered

Designed for courses in Operations Management.

  • Brand Strategy & Management
  • Supply Chain Management & Logistics
  • ESG Strategy & Implementation

Ready to use Eficiencia en Terminal de Contenedores: Barranquilla with your students?

Contact us and we'll set you up with a free trial session.

Contact us