Negocios internacionales · Gestión intercultural

Transferring Know-How — Lift the Marmara Subsidiary to NordHaus Standards

A four-round, advanced international-management simulation set inside Marmara Beyaz Eşya A.Ş., a 1,400-employee Turkish home-appliance maker in the Gebze industrial corridor (revenue ₺11.8bn ≈ €330M, EBITDA 9% vs the 13% group standard).

4 rondas Ejecutivo English, Español

Vista previa

Sobre la simulación

A four-round, advanced international-management simulation set inside Marmara Beyaz Eşya A.Ş., a 1,400-employee Turkish home-appliance maker in the Gebze industrial corridor (revenue ₺11.8bn ≈ €330M, EBITDA 9% vs the 13% group standard). Eighteen months ago the German multinational NordHaus Group acquired 80% of the equity for its low-cost base and MENA access.

The acquisition thesis assumed Marmara would absorb NordHaus' lean-manufacturing, supplier-quality and stage-gate know-how and converge within 24 months — but the integration relied on manuals and an intranet, and almost nothing moved. Defects sit at 14,000 DPMO against a 3,500 group standard (₺290M/year warranty), productivity is 35% short, and time-to-market is 22 months vs 14.

On 9 March 2026 the NordHaus COO issues a 12-month convergence ultimatum: demonstrate measurable progress or local management is replaced by an expatriate team.

Playing the subsidiary leadership team, you (1) diagnose why an 18-month integration produced no convergence — classifying each capability gap as tacit or explicit and locating the dominant knowledge-stickiness barrier in source, channel, recipient or context (Szulanski); (2) allocate a fixed €2.4M transfer budget and a scarce pool of seconded-engineer days across mechanisms — codification, expert secondments, inpatriate assignments to Stuttgart, joint problem-solving, communities of practice and a digital twin — matching mechanism to knowledge type (Polanyi/Nonaka); (3) negotiate the standardise-vs-adapt alignment contract with HQ and the founding family, build supervisor absorptive capacity (Cohen & Levinthal), design inpatriate reintegration, and make the retention move for an at-risk seconded engineer who just received a competitor counter-offer; and (4) commit a 12-month convergence plan with quarterly KPI targets and defend the mechanism→capability→metric→EBITDA chain to the COO.

The math rewards Kiessling's core finding — transfer lifts performance only when paired with strategic alignment — and punishes the five classic errors: codifying tacit know-how, mechanism-shopping past the budget and engineer-day caps, wholesale standardisation without local adaptation, inpatriation with no reintegration, and neglecting the fragile engineer channel.

Final KPIs track Transfer Effectiveness, Strategic Alignment, Subsidiary Performance (convergence index) and Engineer Retention, with budget reported in € to HQ and warranty/EBITDA stakes in ₺.

Para quién es

Una simulación avanzada para participantes acostumbrados a trabajar con los principales marcos y dilemas de la materia, pensada para formación de directivos y profesionales con experiencia.

Cómo funciona una sesión

  1. El docente crea una sesión desde el panel de Eureka e invita a los participantes.
  2. Los participantes juegan 4 rondas. En cada una envían sus decisiones y la simulación calcula los resultados.
  3. La simulación se puede jugar en: English, Español.
  4. El docente sigue el progreso y los resultados de cada participante desde el panel, y usa los resultados de la clase para el debriefing.

Decisiones que toman los participantes

Las decisiones que toman los participantes durante la simulación:

  • After 18 months of manuals and an intranet, why did almost no convergence happen?
  • Using the knowledge-stickiness lens, where does the dominant barrier sit?
  • Which capability carries the most EBITDA value and should anchor the 12-month plan?
  • How candidly does the team name this as a tacit-transfer problem, not a documentation problem? (%)
  • Allocate the €2.4M transfer budget across mechanisms (must total €2.40M)
  • Commit seconded-engineer days to hands-on transfer (pool of 600; documents need none)
  • How many high-potentials do you pull off the line as inpatriates?
  • HQ wants global standardisation; the family wants local adaptation. Where do you draw the line?
  • How much budget into building supervisor absorptive capacity & a bilingual transfer cadence?
  • The strongest seconded engineer just received a Stuttgart-rival counter-offer. Your move?

Qué siguen los participantes

Lo que los participantes siguen en pantalla a medida que avanzan las rondas:

  • Convergence Trajectory

Temas que cubre

Diseñada para asignaturas de Gestión intercultural.

¿Quieres usar Transferring Know-How — Lift the Marmara Subsidiary to NordHaus Standards con tus estudiantes?

Escríbenos y te preparamos una sesión de prueba gratuita.

Contactar