AIChangeOps: Managing Organizational AI Adoption
Lead AI transformation at Continental Insurance Group as Chief Transformation Officer.
A 90-minute, 4-round basic Express simulation for Spanish vocational training (Formacion Profesional), module 0968 Integracion de sistemas de automatizacion industrial of the Tecnico Superior en Automatizacion y Robotica Industrial (Real Decreto 1581/2011) and module 0943 Integracion de sistemas of the Tecnico
A 90-minute, 4-round basic Express simulation for Spanish vocational training (Formacion Profesional), module 0968 Integracion de sistemas de automatizacion industrial of the Tecnico Superior en Automatizacion y Robotica Industrial (Real Decreto 1581/2011) and module 0943 Integracion de sistemas of the Tecnico Superior en Mecatronica Industrial (Real Decreto 1576/2011).
The learner is Leire Arizkorreta, a newly qualified commissioning technician at a fictional metal-stamping plant, Troqueles Valdebrena, between October 2027 and March 2028, commissioning a robot cell that loads a riveting press (six-axis robot, conveyor with a frequency drive, PLC, industrial Ethernet fieldbus, safety relay, HMI and SCADA).
Four situations set the cell's course: the cell wired with the robot not yet in automatic, and how the safety functions are validated (each one tested against the risk assessment and signed) and how the signals are checked (against the I/O list and the drawings); the robot's first collision and the drive that drops off the network, and how the robot's first motions are made (manual at reduced speed) and what is done with the network (its diagnostics read); the robot waiting at the press without an alarm, and how the sequence is diagnosed (both programs in monitoring with the handshake table) and how the SCADA is built (on the machine states); and the site acceptance test and the change control after the handover.
Three critical errors (safety overrides) cap the round: a fence door interlock bridged, the robot's collision detection and safe zones disabled, a signal forced in the PLC. KPIs: OEE of the cell, commissioning cost, minutes stopped per fault and robot collisions. Spanish primary, English parity. Fictional companies and people; real regulations, standards and curriculum cited.
Al terminar la sesión, los participantes serán capaces de:
Una simulación introductoria que no requiere conocimientos previos de la materia, pensada para asignaturas de grado. También funciona en formación profesional, bachillerato y sesiones de onboarding.
Las decisiones que toman los participantes durante la simulación:
Escríbenos y te preparamos una sesión de prueba gratuita.
Contactar