Negocios

Financiar un largometraje

A 90-minute, 4-round basic Express simulation for Spanish vocational training (Formacion Profesional), module 0916 Gestion de proyectos de cine, video y multimedia of the Tecnico Superior en Produccion de Audiovisuales y Espectaculos (Real Decreto 1681/2011).

4 rondas Grado English, Español

Vista previa

Sobre la simulación

A 90-minute, 4-round basic Express simulation for Spanish vocational training (Formacion Profesional), module 0916 Gestion de proyectos de cine, video y multimedia of the Tecnico Superior en Produccion de Audiovisuales y Espectaculos (Real Decreto 1681/2011).

The learner is Nerea Basarrate, a newly qualified assistant to the executive producer of a small production company who builds and runs the financing plan and the cash of a fictional low-budget feature film: a 2 million euro budget, six layers of financing (own money, the State production aid, the tax incentive through investors, a minority coproducer, a presale and a product placement) and 270,000 euros uncovered, from January to December 2027.

Four situations set the film's course: January, and how the financing plan is built (by layers, each with the date on which it pays, against a monthly cash plan, not built on the State aid without checking when it is paid) and what is done with the rights (the television rights presold under a contract the bank accepts, not every right sold now to a platform); April, before the shoot, and how the cash of the shoot is covered (a bridge loan that discounts the aid resolution and the presale, with a weekly cash plan) and what is done with the product placement (a written contract with brands that fit the story); May, after the shoot, and how the gap of the post-production is covered (discounted with the bank, not an investor who recovers 150 per cent first) and how the overrun and the cost audit are handled (real invoices); and October, and how the windows are ordered and the receipts shared (a recoupment order in writing).

Two critical errors cap the round: holding back the crew's wages and inflating the certified cost. Some mistakes look fine on the day and come back later through the dates each layer pays. KPIs: financing covered on time, production and financial cost, own capital at risk and days of cash in the red. Lesson: a film is financed in layers, and each layer pays at a different moment. Spanish primary, English parity.

Fictional company, film, town and people; real curriculum and rules cited.

Para quién es

Una simulación introductoria que no requiere conocimientos previos de la materia, pensada para asignaturas de grado. También funciona en formación profesional, bachillerato y sesiones de onboarding.

Cómo funciona una sesión

  1. El docente crea una sesión desde el panel de Eureka e invita a los participantes.
  2. Los participantes juegan 4 rondas. En cada una envían sus decisiones y la simulación calcula los resultados. La primera ronda arranca con: lunes 11 de enero, 9:00: el plan de financiación y los derechos.
  3. La simulación se puede jugar en: English, Español.
  4. El docente sigue el progreso y los resultados de cada participante desde el panel, y usa los resultados de la clase para el debriefing.

Decisiones que toman los participantes

Las decisiones que toman los participantes durante la simulación:

  • Cómo se construye el plan de financiación
  • Qué se hace con los derechos
  • Cómo se cubre la caja del rodaje
  • Qué se hace con el emplazamiento
  • Cómo se cubre el hueco de la posproducción
  • Cómo se tratan el sobrecoste y la auditoría
  • Cómo se ordenan las ventanas
  • Cómo se reparten los ingresos

¿Quieres usar Financiar un largometraje con tus estudiantes?

Escríbenos y te preparamos una sesión de prueba gratuita.

Contactar