Estrategia y dirección · Implementación de la estrategia

Building Resilience — Calderwood Logistics' Evidence-Based Portfolio

A four-round, advanced organisational-resilience simulation set inside Calderwood Logistics plc, a mid-cap UK third-party logistics group (GBP 620M revenue, 6% margin, 4,300 staff, 8 distribution centres).

4 rondas Ejecutivo English, Español

Vista previa

Sobre la simulación

A four-round, advanced organisational-resilience simulation set inside Calderwood Logistics plc, a mid-cap UK third-party logistics group (GBP 620M revenue, 6% margin, 4,300 staff, 8 distribution centres).

A 48-hour outage of the core warehouse-management system — a failed supplier update with no tested fallback — has just cost GBP 1.1 million, put a GBP 48M healthcare contract under review, and convinced the board that a decade of relentless cost optimisation has made Calderwood one of the leanest and most brittle operators in its sector.

You lead the strategic-change team chartered to make the organisation genuinely resilient, on evidence rather than consultancy fashion, within a hard GBP 6 million two-year budget against a GBP 14M wish-list and a 120-day board deadline.

Grounded in David Denyer's Cranfield/BSI framework, the simulation runs the dual spine of organisational resilience and evidence-based management across four rounds: (1) diagnose vulnerabilities across six domains — operational, financial, supply chain, people, cyber, culture — and distinguish the two-to-three could-kill-us existential threats (the untested WMS single point of failure foremost) from the merely costly; (2) rate the evidence behind each proposed intervention as strong, moderate or weak/vendor-driven, and refuse to fund a fashionable AI 'resilience platform' backed by a single case study; (3) build the funded portfolio within GBP 6M, balancing defensive resilience (redundancy, tested failover, continuity, insurance) against progressive resilience (sensing, adaptive capacity, learning loops, culture change) — every pound spent defensively cannot be spent progressively; and (4) commit and defend the plan to the board chair, answering the central challenge 'how is this different from the risk management we have always funded, and will it actually stop the next failure?'.

The math rewards the concept-correct play — existential gaps fixed first, evidence-led funding, a genuine defensive/progressive balance, and a cultural intervention that sustains the capability — and measurably punishes the six classic errors: funding without evidence, an all-defence or all-progression portfolio, treating resilience as a one-off project, diagnosing everything as equally urgent, and ignoring the cultural root cause.

Final KPIs track Resilience Score, Existential Coverage, Adaptive Capacity and Budget committed against the GBP 6M cap.

Para quién es

Una simulación avanzada para participantes acostumbrados a trabajar con los principales marcos y dilemas de la materia, pensada para formación de directivos y profesionales con experiencia.

Cómo funciona una sesión

  1. El docente crea una sesión desde el panel de Eureka e invita a los participantes.
  2. Los participantes juegan 4 rondas. En cada una envían sus decisiones y la simulación calcula los resultados.
  3. La simulación se puede jugar en: English, Español.
  4. El docente sigue el progreso y los resultados de cada participante desde el panel, y usa los resultados de la clase para el debriefing.

Decisiones que toman los participantes

Las decisiones que toman los participantes durante la simulación:

  • How do you triage the 14-item, multi-domain risk register?
  • How candidly does your team name the cultural root cause — efficiency prized over adaptability? (%)
  • How do you appraise the evidence behind each proposed intervention?
  • Rate the evidence behind the tested WMS failover (proven single-point-of-failure fix)
  • Split the £6M cap between defensive and progressive resilience (must total £6.0M)
  • Is the existential WMS single point of failure funded inside your defensive spend?
  • The board chair asks: how is this different from the risk management we have always funded?
  • How do you make resilience last once the programme ends in 18 months?
  • What do you commit to measure for the board?
  • Conviction: how firmly do you defend that genuine resilience beats another generic risk programme? (%)

Qué siguen los participantes

Lo que los participantes siguen en pantalla a medida que avanzan las rondas:

  • Resilience Trajectory

Temas que cubre

Diseñada para asignaturas de Implementación de la estrategia.

¿Quieres usar Building Resilience — Calderwood Logistics' Evidence-Based Portfolio con tus estudiantes?

Escríbenos y te preparamos una sesión de prueba gratuita.

Contactar