Operations & Supply Chain · Supply Chain Management

Subcontratación de Obra — Managing Subcontractors on a Multi-Package Project

Run Constructora Andina Civil through 4 high-stakes rounds: tier 9 subcontractors by leading indicators, triage a live solidaria-laboral salaries crisis with the right legal channel, negotiate with the interventoría and rewrite contrato-espejo gaps, and lock a 3-year post-cierre framework with a board-defensible KPI.

4 rounds Executive English, Español

Preview

About this simulation

Run Constructora Andina Civil through 4 high-stakes rounds: tier 9 subcontractors by leading indicators, triage a live solidaria-laboral salaries crisis with the right legal channel, negotiate with the interventoría and rewrite contrato-espejo gaps, and lock a 3-year post-cierre framework with a board-defensible KPI. Practitioners learn risk-based retention sizing, Art.

34 CST exposure management, and tail-risk control for civil-works general contractors.

Who it is for

An advanced simulation for participants used to working with the main frameworks and trade-offs of the subject, designed for executive education and experienced professionals.

How a session runs

  1. The instructor creates a session from the Eureka dashboard and invites the participants.
  2. Participants play 4 rounds. In each one they submit their decisions and the simulation calculates the results.
  3. The simulation can be run in English, Español.
  4. The instructor follows each participant's progress and results from the dashboard, and uses the class results for the debrief.

Decisions participants make

The decisions participants make during the simulation:

  • Retention sizing across 9 subs
  • PILA monitoring cadence
  • Precalification rebuild
  • Eléctricas Bogotá triage move
  • Legal channel for any payment
  • Plan for the 27 Eléctricas workers
  • Mirror-clauses (contrato espejo) modificatorio
  • Posture with the interventoría
  • Response to the 3 other PILA-gap subs
  • 3-year post-cierre control package

What participants track

What participants follow on screen as the rounds go by:

  • Diagnose the 9-package portfolio

Subjects covered

Designed for courses in Supply Chain Management.

Ready to use Subcontratación de Obra — Managing Subcontractors on a Multi-Package Project with your students?

Contact us and we'll set you up with a free trial session.