About this simulation
MBA-level cross-border M&A simulation. Helio Verde signed an exclusivity LOI to buy Mexican meat processor Cárnicos del Pacífico for USD 920M EV; the team has eight working days across three rounds (Diagnose / Design / Defend) to lock SPA architecture, decide CFIUS posture on the McAllen plant, and file under EU Reg 139/2004 before the Chair walks into a board pre-read.
What participants learn
After the session, participants will be able to:
- Design a dual-track US and European regulatory sequence that protects the long-stop date, weighing the cost of a voluntary foreign-investment filing against the cost of not filing
- Allocate deal risk through price mechanism, warranties, indemnification, material-adverse-change clause and termination fees, and quantify in dollars who bears what under each draft
- Decompose a premium over the peer multiple into buyer-specific sources of value and test which of them survive corporate-finance theory
- Compare integration structures for a target bought by a group whose own subsidiary is in restructuring, and choose one that protects both the earn-out and the turnaround
- Frame an acquisition recommendation for a sceptical controlling principal, with scope, sequence and a walk-away condition, and defend it against the questions he actually asked
Prerequisites
- Discounted-cash-flow valuation and the idea of a control premium
Who it is for
An advanced simulation for participants used to working with the main frameworks and trade-offs of the subject, designed for executive education and experienced professionals.
How a session runs
- The instructor creates a session from the Eureka dashboard and invites the participants.
- Participants play 3 rounds. In each one they submit their decisions and the simulation calculates the results. The first round opens with: Diagnose · SPA Architecture (28 min).
- The simulation can be run in English, Español.
- The instructor follows each participant's progress and results from the dashboard, and uses the class results for the debrief.
Decisions participants make
The decisions participants make during the simulation:
- 1. Purchase-Price Mechanism
- 2. R&W Structure
- 3. Indemnification Caps and Survival
- 4. MAC Language (Delaware Canon)
- 5. Termination Fees and Reverse-TF
- CFIUS Posture (McAllen plant · 31 CFR Part 800)
- EU Posture (Reg 139/2004 · Article 1(2)/1(3) thresholds)
- Defending the 12.0× Multiple vs Peer 9.2×
- Framing CFIUS Scope to the Chair
- Integration Approach During Ley Concursal Cure Period
What participants track
What participants follow on screen as the rounds go by:
- Round History · Coach Notes
Subjects covered
Designed for courses in Business Law.