Operations & Supply Chain · Project Management

Torre Cúspide Andina — High-Rise Vertical Construction Crisis

A 38-storey tower in Bogotá hits three crises at once: the floor cycle slipped, a wind reanalysis raised loads 12%, and the curaduría flagged Title J evacuation.

4 rounds Executive English, Español

Preview

About this simulation

A 38-storey tower in Bogotá hits three crises at once: the floor cycle slipped, a wind reanalysis raised loads 12%, and the curaduría flagged Title J evacuation. Diagnose the binding constraint in the self-climbing formwork cycle, reconcile the structure to the new wind environment, lock the Title J licensing path, and present a board-defensible handover-probability KPI. Bilingual (ES/EN).

Who it is for

An advanced simulation for participants used to working with the main frameworks and trade-offs of the subject, designed for executive education and experienced professionals.

How a session runs

  1. The instructor creates a session from the Eureka dashboard and invites the participants.
  2. Participants play 4 rounds. In each one they submit their decisions and the simulation calculates the results. The first round opens with: Diagnose the Floor-Cycle Slip.
  3. The simulation can be run in English, Español.
  4. The instructor follows each participant's progress and results from the dashboard, and uses the class results for the debrief.

Decisions participants make

The decisions participants make during the simulation:

  • Binding Constraint
  • Recovery Target
  • Structural Response
  • Evacuation Strategy
  • Licensing Path
  • Hoist Extension
  • Contingency Buffer

Subjects covered

Designed for courses in Project Management.

Ready to use Torre Cúspide Andina — High-Rise Vertical Construction Crisis with your students?

Contact us and we'll set you up with a free trial session.

Contact us