Operations & Supply Chain · Supply Chain Management

Stock Smart — Multi-Echelon Inventory at Noordveld Components

A four-round, intermediate inventory and operations simulation set inside Noordveld Components B.V., a €148M Tilburg-based distributor of industrial drive components serving the Benelux and western Germany.

4 rounds MBA & Masters English, Español

Preview

About this simulation

A four-round, intermediate inventory and operations simulation set inside Noordveld Components B.V., a €148M Tilburg-based distributor of industrial drive components serving the Benelux and western Germany.

Noordveld runs a two-echelon network — one central distribution centre (CDC) holding 6,200 SKUs that replenishes four regional stocking points (RSPs) in Rotterdam, Eindhoven, Antwerp and Düsseldorf — and guarantees a 97% line-item fill rate within 24 hours to its top accounts.

On 9 March 2026 the promise is breaking: measured fill rate has slipped to 91.4%, yet inventory has ballooned to €31M and turns have fallen from 4.1 to 3.6. The board gives the planning team one S&OP cycle to fix service WITHOUT adding net working capital — or it outsources planning to a 3PL, cutting nine roles. Low service and high stock at once is the classic signature of inventory at the wrong echelon.

Playing the supply-chain planning team, you work the multi-echelon logic of Ton de Kok's research. Round 1 (Diagnose): segment the 40-SKU basket by volume AND variability (coefficient of variation), locate the €5.8M of dead RSP buffer, and find the under-buffered fast movers actually driving the fill-rate miss.

Round 2 (Plan): set a differentiated cycle-service-level policy and size safety stock with SS = z × σ, building reorder points on demand-during-lead-time — discovering that service is non-linear, with slow lumpy lines costing ~3× the buffer per service point of the fast movers.

Round 3 (Decide): place safety stock across the two echelons, exploiting risk pooling (the square-root law) by consolidating lumpy demand at the CDC while forward-deploying the fast stable lines, funding the redesign cash-neutrally from the dead stock and optimizing the network jointly rather than echelon-by-echelon.

Round 4 (Recover): stress-test the policy against a supplier lead time that doubles from 3 to 6 weeks and a +40% Düsseldorf demand spike, recomputing exposed reorder points and lateral-shipping from the central pool, then defend the plan to the board on the service-cost frontier.

The math rewards variability-aware segmentation, differentiated service targets, demand-during-lead-time reorder points, central risk pooling, cash-neutral redeployment and joint network optimization — and punishes the five classic errors: uniform 98% targets, forward-deploying everything, average-demand reorder points, buying out of the problem, and single-stage silo thinking.

Final KPIs track fill rate (%), inventory on hand (€M), inventory turns (×) and quarterly service P&L.

Who it is for

An intermediate simulation for participants who already know the core concepts of the subject, designed for master's and MBA programmes.

How a session runs

  1. The instructor creates a session from the Eureka dashboard and invites the participants.
  2. Participants play 4 rounds. In each one they submit their decisions and the simulation calculates the results.
  3. The simulation can be run in English, Español.
  4. The instructor follows each participant's progress and results from the dashboard, and uses the class results for the debrief.

Decisions participants make

The decisions participants make during the simulation:

  • How do you segment the 40-SKU basket to find where the buffer is misplaced?
  • Where is the €5.8M of dead buffer hiding, and why?
  • Which SKUs are driving the fill-rate miss?
  • How much of this cycle’s effort do you commit to the diagnosis before acting? (%)
  • Set the cycle-service-level policy across segments (this sets the z-factor and the buffer).
  • How do you build the reorder points (ROP = demand-during-lead-time + safety stock)?
  • You test the marginal cost of each service point. How do you read it?
  • Target cycle service level for the fast, service-critical segment (%).
  • The core call: where do you place the safety stock across the two echelons?
  • How do you fund the redeployment under the cash-neutral constraint?

What participants track

What participants follow on screen as the rounds go by:

  • Your Planning Decisions This Round
  • Round-by-Round Planning Record
  • Service vs. Working Capital Trajectory

Subjects covered

Designed for courses in Supply Chain Management.

Ready to use Stock Smart — Multi-Echelon Inventory at Noordveld Components with your students?

Contact us and we'll set you up with a free trial session.

Contact us