Torre Cúspide Andina — High-Rise Vertical Construction Crisis
A 38-storey tower in Bogotá hits three crises at once: the floor cycle slipped, a wind reanalysis raised loads 12%, and the curaduría flagged Title…
Lead Manufactura Atlas through a $12M Oracle ERP implementation over 24 months. Select methodology (Waterfall, Agile, or Hybrid), manage scope discipline under change pressure, invest in change management, staff the project, and make the go-live decision.
Lead Manufactura Atlas through a $12M Oracle ERP implementation over 24 months. Select methodology (Waterfall, Agile, or Hybrid), manage scope discipline under change pressure, invest in change management, staff the project, and make the go-live decision. Practice the PMBOK iron triangle, earned value management, and Kotter change leadership in a Mexican manufacturing context.
Una simulación avanzada para participantes acostumbrados a trabajar con los principales marcos y dilemas de la materia, pensada para formación de directivos y profesionales con experiencia.
Las decisiones que toman los participantes durante la simulación:
Lo que los participantes siguen en pantalla a medida que avanzan las rondas:
Diseñada para asignaturas de Gestión de proyectos.
Escríbenos y te preparamos una sesión de prueba gratuita.
Contactar