Operations & Supply Chain · Supply Chain Management

Bullwhip Buster — Siam Pantry's Four-Tier Supply Chain

A four-round, advanced operations and supply-chain simulation set inside Siam Pantry Co., Ltd., a THB 4.2 billion Thai manufacturer-distributor of instant noodles, ready-to-drink coffee and sauces that sells through a classic four-tier chain — factory → regional distribution centres → wholesalers → modern-trade and

4 rounds Executive English, Español

Preview

About this simulation

A four-round, advanced operations and supply-chain simulation set inside Siam Pantry Co., Ltd., a THB 4.2 billion Thai manufacturer-distributor of instant noodles, ready-to-drink coffee and sauces that sells through a classic four-tier chain — factory → regional distribution centres → wholesalers → modern-trade and traditional retailers.

End-consumer demand varies only ±6% week to week, yet factory production orders swing ±48% in normal weeks and spiked +62% after a single four-week price promotion: a textbook bullwhip effect.

The company carries THB 620M of inventory at a 9% cost of capital, still suffered stockouts in 11% of outlets during the promotion, runs a 38% factory forecast error (MAPE) against a 15% best-practice target, and absorbed THB 240M of excess stock plus THB 31M of write-offs.

Playing the Operations Strategist, the learner must dampen the amplification without breaching an THB 18M/year coordination-and-systems budget or dropping service. Round 1: diagnose the bullwhip — compute the variance amplification ratio tier by tier and rank its four classic causes (demand-signal processing, order batching, price-promotion swings, rationing and shortage gaming).

Round 2: the core design — choose an ordering policy (independent reorder-point, smaller more-frequent orders, base-stock with order smoothing, or coordinated replenishment), an information-sharing level (none, POS-data sharing, shared forecast, or VMI/CPFR), and a promotion policy (deep periodic discounts, scheduled capacity-aware promos, or everyday-low-price), each consuming budget and changing variance, cost and service.

Round 3: stress-test the design against live shocks — a viral demand spike, a lead-time disruption, and a key wholesaler refusing to share POS data — and patch it with a fallback and a shock-response rule. Round 4: present the board-and-partner scorecard, forecasting order variance, inventory cost, service level and forecast error within the THB 18M budget.

The math rewards coordination and information-sharing over inventory accumulation, complementary policy-plus-information design, smoothing that stays responsive to a real surge, contingencies for non-cooperating partners, and disciplined promotion policy — and punishes the six classic errors: piling safety stock at every tier, smoothing orders without sharing demand, over-smoothing into a stockout, assuming free POS visibility, keeping deep promos that re-trigger the whipsaw, and over-spending the coordination budget.

Final KPIs track factory order variance (%), inventory cost (THB M/year), service level (%) and forecast error (MAPE %).

Who it is for

An advanced simulation for participants used to working with the main frameworks and trade-offs of the subject, designed for executive education and experienced professionals.

How a session runs

  1. The instructor creates a session from the Eureka dashboard and invites the participants.
  2. Participants play 4 rounds. In each one they submit their decisions and the simulation calculates the results.
  3. The simulation can be run in English, Español.
  4. The instructor follows each participant's progress and results from the dashboard, and uses the class results for the debrief.

Decisions participants make

The decisions participants make during the simulation:

  • Where in the chain does demand amplification grow fastest, and what does that tell you?
  • Rank the dominant cause of the amplification.
  • Your opening hypothesis for the fix.
  • How rigorously do you quantify the current-state cost before designing? (%)
  • Ordering policy across the tiers.
  • Information-sharing level.
  • Promotion & pricing policy.
  • Extra coordination spend committed this round (฿M, of ฿18M total).
  • Shock A — the noodle line goes viral: a real +40% demand surge. How does your design respond?
  • Shock B — port congestion adds two weeks to imported packaging lead time.

What participants track

What participants follow on screen as the rounds go by:

  • Round-by-Round Scorecard
  • Order Variance, Inventory Cost & Forecast Error Trajectory

Subjects covered

Designed for courses in Supply Chain Management.

Ready to use Bullwhip Buster — Siam Pantry's Four-Tier Supply Chain with your students?

Contact us and we'll set you up with a free trial session.

Contact us