Edificio Quindio: Critical Path and Fast-Tracking
Owner just demanded 6-week-earlier delivery on a baselined 38-week construction CPM, while a Week-12 progress shock has eaten the float.
MBA / Executive-Education simulation in which a PMO Design task force has 75 minutes to recommend an operating model for Helio Verde Energía's project portfolio.
MBA / Executive-Education simulation in which a PMO Design task force has 75 minutes to recommend an operating model for Helio Verde Energía's project portfolio.
Three rounds (Diagnose → Design → Defend) walk participants through the four-dimension contingency frame, the three PMO archetypes (centralised, federated, coaching), and the audit-committee defence under simultaneous pressure from Patricia Echeverría and the Northern-Region GM Tomás Acuña.
Teaches contingency-grounded archetype choice, authority-gradient design, the Aubry-Hobbs maturity ramp, and the architecture-vs-parameters discipline.
Una simulación avanzada para participantes acostumbrados a trabajar con los principales marcos y dilemas de la materia, pensada para formación de directivos y profesionales con experiencia.
Las decisiones que toman los participantes durante la simulación:
Lo que los participantes siguen en pantalla a medida que avanzan las rondas:
Diseñada para asignaturas de Gestión de proyectos.
Escríbenos y te preparamos una sesión de prueba gratuita.
Contactar