Seven Days to Sprint Zero

You are Marte Solheim, two days into the job as engineering manager of Atlas Core at Fjordkart, an Oslo mapping-software company that has never tracked anyone's time. Its largest contract ever carries a fixed date and a penalty clause, and the board wants visibility and control. Before sprint zero opens next week, you must decide what you will offer its delivery committee.

The situation

It is Wednesday, 4 March 2026. Fjordkart sells mapping and route-optimisation software on subscription, with NOK 210 million in annual recurring revenue. Each squad chooses its own tools and pace, and the company quotes two numbers with pride: engagement in the 88th percentile of Nordic tech firms, and voluntary attrition of 6%. It has just signed a real-time routing build for the cold-chain logistics operator Nordfrakt worth NOK 24 million, due on 1 December, with a late penalty of NOK 400,000 a week capped at NOK 4.8 million, and a customer right to walk away after six weeks of slippage.

Within days, a member of the delivery committee drafted three measures: activity dashboards built on commits and keystrokes, mandatory daily time-logging, and a bonus of NOK 60,000 per engineer, payable only if 1 December is hit. Nothing has been installed yet, but the eleven engineers reacted to the rumour: their intrinsic-motivation index fell from 82 to 71 in eight days. Company history says that below 60 a squad produces less than its own baseline.

Underneath sits an arithmetic problem. The build was estimated at about 7,200 engineering hours, and the two squads assigned supply about 6,400: some 800 short. Two people, Eirik Lund and Sunniva Bakke, hold the routing algorithm in their heads; both have updated their public profiles since the announcement. Replacing either would cost NOK 1.1 million and four to five months of lost pace. The committee's model gives on-time delivery a 52% chance.

You come from running a public-sector squad that shipped to immovable dates without a single time report, but your appointment came from the committee, not from the squad. The committee wants the controls in before sprint zero; the chief technology officer holds that any dashboard will cost more output than it returns. Neither has put a number on the claim.

Your job in this case: look at what has already moved and what has not, work out what lateness and one key departure would cost, and decide what you offer the committee before the work begins.

The decision

What do you offer the delivery committee before sprint zero?

  • A · Install the committee's controls now
  • B · Decline monitoring, with no extra reporting
  • C · Offer a delivery signal built on outcomes

The rest of the case is locked

The data, the calculations, the decision itself and what happens next open with your institution's access code.

Have an access code?

No code yet?

Instructors can request access for a course. Tell us who you are and which course it is for, and we will send your institution a code.

Run it live in class: every student decides and justifies, and the whole class sees how it splits. How Eureka Case works →